Best Drupal HostingBest Joomla HostingBest Wordpress Hosting

Archived Tender Notices

 
 
Release Closing Status
1 Evaluation Report TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (PUBLIC ADDRESS SYSTEM (PAS) AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
17 Aug, 2016
26 Aug, 2016
Closed
2 PROVISION, COMMISSIONING, INSTALLATION, CALIBRATION, INTEGRATION, TESTING, AND EXECUTION OF IT SYSTEMS (CCTV SURVEILLANCE, CONNECTIVITY) FOR FEEDER ROUTES IN MULTAN
16 Aug, 2016
31 Aug, 2016
Closed
3 TENDER FOR FURNISHING AND INSTALLATION OF SIGNS AND POST ASSEMBLIES AT FEEDER ROUTE BUS STOPS FOR INTEGRATED BUS OPERATIONS IN LAHORE
12 Aug, 2016
05 Sep, 2016
Closed
4 EVALUATION REPORT PROVISION, COMMISSIONING, INSTALLATION, CALIBRATION, INTEGRATION, TESTING AND EXECUTION OF IT SYSTEMS (CCTV SURVEILLANCE AND CONNECTIVITY) FOR FEEDER ROUTES IN LAHORE
11 Aug, 2016
20 Aug, 2016
Closed
5 EVALUATION REPORT-PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (GIGABIT PASSIVE OPTICAL NETWORK (GPON) BASED OPTICAL FIBER NETWORK AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
10 Aug, 2016
19 Aug, 2016
Closed
6 ADDENDUM NO.1 PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CORE SWITCHES & FIREWALL WITH ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
29 Jul, 2016
05 Aug, 2016
Closed
7 ADDENDUM NO1 PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CCTV SURVEILLANCE SYSTEM AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
29 Jul, 2016
04 Aug, 2016
Closed
8 TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CORE SWITCHES & FIREWALL WITH ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
21 Jul, 2016
05 Aug, 2016
Closed
9 TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CCTV SURVEILLANCE SYSTEM AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
20 Jul, 2016
04 Aug, 2016
Closed
10 ADDENDUM NO. 1 FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (GIGABIT PASSIVE OPTICAL NETWORK (GPON) BASED OPTICAL FIBER NETWORK AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
23 Jun, 2016
01 Jul, 2016
Closed