Best Drupal HostingBest Joomla HostingBest Wordpress Hosting

Archived Tender Notices

 
 
Release Closing Status
1 EVALUATION REPORT PROVISION, COMMISSIONING, INSTALLATION, CALIBRATION, INTEGRATION, TESTING AND EXECUTION OF IT SYSTEMS (CCTV SURVEILLANCE AND CONNECTIVITY) FOR FEEDER ROUTES IN LAHORE
11 Aug, 2016
20 Aug, 2016
Closed
2 EVALUATION REPORT-PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (GIGABIT PASSIVE OPTICAL NETWORK (GPON) BASED OPTICAL FIBER NETWORK AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
10 Aug, 2016
19 Aug, 2016
Closed
3 ADDENDUM NO.1 PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CORE SWITCHES & FIREWALL WITH ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
29 Jul, 2016
05 Aug, 2016
Closed
4 ADDENDUM NO1 PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CCTV SURVEILLANCE SYSTEM AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
29 Jul, 2016
04 Aug, 2016
Closed
5 TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CORE SWITCHES & FIREWALL WITH ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
21 Jul, 2016
05 Aug, 2016
Closed
6 TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (CCTV SURVEILLANCE SYSTEM AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
20 Jul, 2016
04 Aug, 2016
Closed
7 ADDENDUM NO. 1 FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (GIGABIT PASSIVE OPTICAL NETWORK (GPON) BASED OPTICAL FIBER NETWORK AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
23 Jun, 2016
01 Jul, 2016
Closed
8 TENDER FOR PROCUREMENT, OPERATION AND MAINTENANCE OF FEEDER BUSES FOR INTEGRATED BUS OPERATIONS IN RAWALPINDI
18 Jun, 2016
04 Jul, 2016
Closed
9 TENDER FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (GIGABIT PASSIVE OPTICAL NETWORK (GPON) BASED OPTICAL FIBER NETWORK AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
16 Jun, 2016
01 Jul, 2016
Closed
10 ADDENDUM NO.1 FOR PROVISION, INSTALLATION, TESTING, COMMISSIONING, CALIBRATION AND INTEGRATION OF IT SYSTEMS (ETHERNET SWITCHES AND ALLIED EQUIPMENT) FOR MULTAN METROBUS SYSTEM
15 Jun, 2016
24 Jun, 2016
Closed