Archived Tenders

Title Closing Date Release Date Attachment
Addendum No 1 To Provision, Commissioning, Installation, Calibration, Integration, Testing, And Execution Of It Systems (Cctv Surveillance, Connectivity) For Feeder Routes In Multan 08/31/2016 08/25/2016 Pdf file
Evaluation Report For Tender For Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Ethernet Switches And Allied Equipment) For Multan Metrobus System 08/28/2016 08/19/2016 Pdf file
Evaluation Report Tender For Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Public Address System (Pas) And Allied Equipment) For Multan Metrobus System 08/26/2016 08/17/2016 Pdf file
Provision, Commissioning, Installation, Calibration, Integration, Testing, And Execution Of It Systems (Cctv Surveillance, Connectivity) For Feeder Routes In Multan 08/31/2016 08/16/2016 Pdf file
Tender For Furnishing And Installation Of Signs And Post Assemblies At Feeder Route Bus Stops For Integrated Bus Operations In Lahore 09/05/2016 08/12/2016 Pdf file
Evaluation Report Provision, Commissioning, Installation, Calibration, Integration, Testing And Execution Of It Systems (Cctv Surveillance And Connectivity) For Feeder Routes In Lahore 08/20/2016 08/11/2016 Pdf file
Evaluation Report-Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Gigabit Passive Optical Network (Gpon) Based Optical Fiber Network And Allied Equipment) For Multan Metrobus System 08/29/2016 08/10/2016 Pdf file
Addendum No.1 Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Core Switches & Firewall With Allied Equipment) For Multan Metrobus System 08/05/2016 07/29/2016 Pdf file
Addendum No1 Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Cctv Surveillance System And Allied Equipment) For Multan Metrobus System 08/04/2016 07/29/2016 Pdf file
Tender For Provision, Installation, Testing, Commissioning, Calibration And Integration Of It Systems (Core Switches & Firewall With Allied Equipment) For Multan Metrobus System 08/05/2016 07/21/2016 Pdf file